Thursday, June 24, 2010

Bathrooms Remodel

On this project we remodeled both bathrooms.

We rearranged the first bathroom and installed a steam shower.

Before:
After:

After:

Before:

After:

The second bathroom was a replacement of a tub with a tile shower. We added a curved curb and shower curtain in order to maximize the space.

Before:
After:

After:

After:

No comments:

Post a Comment